A company typically decides on an acceptable business continuity plan based on the financial impact to the business when systems are unavailable. So the company determines the financial impact by considering many factors, such as the loss of business and the damage to its reputation due to downtime or the lack of systems availability.

The common metrics for business continuity, commonly refer to Recovery Time Objective and the Recovery Point Objective. So let’s just delve into these two concepts.

Recovery Time Objective (RTO)

Recovery Point Objective (RPO)

And that’s gonna impact how we design our systems to be as highly available and as fault tolerant as possible for a transactional business like that. Another scenario might be that the business can absorb some outage, but it does need to have the systems up and running again as soon as possible. In which case RTO might be the priority.

And part of your business continuity planning needs to be, to define what is the priority, the Recovery Time Objective, i.e how quickly we can get the system back up and running again so it can answer queries and requests and be fully functional, or is it the Recovery Point Objective that’s our priority that we must be able go back to the last possible point in time without any data loss.

There’s a number of different scenarios that we can apply in AWS to help meet the RPOs and RTOs. And the first one is what we call backup and restore now with backup and restore data is stored as a virtual tape library using AWS storage gateway or another network appliance or of a similar nature.

Backup and Restore

Now we need to select the appropriate tools and methods to back up our data into AWS. Three things to keep in mind first, ensure that you have an appropriate retention policy for this data.

  1. How long we go to keep, these virtual tape archives for, is it six months? Is it a year? Is it five years? What are the commercial and, compliance requirements, etc?
  2. Ensure that the appropriate security measures are in place for this data, including the encryption and access policies. So can we guarantee that where it’s been stored is gonna be suitably secure?
  3. We need to make sure that we regularly test the recovery of the data and the restoration of the system.

Pilot Light

Data is mirrored and the environment is scripted as a template, which can be built out and scaled in the unlikely event of a disaster and a few steps that we need to go through to make pilot light work.

  1. First, we set up Amazon EC2 instances to replicate or mirror our data.
  2. Second, we ensure that we have all supporting custom software packages available in AWS. So that can be quite an over operational overhead to ensure that we have all of the latest and greatest custom software packages that we need for our environment available in AWS.
  3. Third, we need to create and maintain Amazon machine images of a key service where fast recovery is required.
  4. Fourth, we need to regularly run these servers, test them and apply any software updates and configuration changes to ensure that they’re going to match what our production environment currently is in the event of a disaster
  5. Fifth we need to consider automating the provisioning of AWS services as much as possible with cloud formation.

Basically horizontal scaling is often the most cost effective and scalable approach to add capacity to the pilot light system. As an example, we can add more web servers at peak times during the day. However, we can also choose larger Amazon EC2 instance types and thus scale vertically for applications such as our relational databases and file storage, for example. And any required DNS updates can be done in parallel.

Warm standby

Essentially, ready to go with all key services running in the most minimal possible way.

  1. First we set up our Amazon EC2 instances to replicate or mirror data.
  2. Secondly, we create a maintain Amazon machine images as required
  3. Third, we run our application using a minimum footprint of AWS EC2 instances or AWS infrastructure. So it’s basically the bare minimum that we can get by with.
  4. Fourth, we patch and update software and configuration files in line with our live environment. So we’re essentially running a smaller version of our full production environment.

Then during our recovery phase, in the case of failure of the production system, the standby environment will be scaled up for production load. And the DNS records will be changed to route all traffic to the AWS environment.

Multi-site

With multi-site we set up our AWS environment to duplicate our production environment. So essentially we’ve got a mirror of reproduction running in AWS.

  1. Firstly, we set up DNS waiting or a similar traffic routing technology if we’re not using route 53 to distribute incoming requests to both sites.
  2. we also configure automated fail over to reroute traffic away from the affected site in the event of an outage.

Now in our recovery phase, traffic is cut over to the AWS infrastructure by updating the DNS record in Route 53 and all traffic and supporting data queries are supported by the AWS infrastructure. Our multi-site scenario is usually the preferred one and where time is a priority Recovery Time and Recovery Point Time are our priorities and costs are not the main constraint the nets would be the ideal scenario.

Okay, so one key thing to ensure when we’re running any of our scenarios is to ensure that we test the recover data. So once we’ve restored our primary site to a working state, we then need to restore to a normal service, which is often referred to as a fail back process. So depending on your DR strategy, this typically means reversing the flow of data replication so that any data updates received while the primary site was down can be replicated back without loss of data.

Testing Recovered Data

Backup and Restore

  1. Freeze data changes to the DR site
  2. Take a backup
  3. Restore the backup to the primary site
  4. Re-point users to the primary site
  5. Unfreeze the changes

Pilot Light, Warm Standby and Multi-site

  1. Establish reverse mirroring/replication from the DR site back to the primary site, once the primary site has caught up with the changes
  2. Freeze data changes to the DR site.
  3. Re-point users to the primary site.
  4. Unfreeze the changes.

Replication: Considerations

When you replicate data to a remote location, you really need to think through a number of factors.

Replication: The basics

(can be confusing)

Synchronous replication

Asynchronous replication


Summary